Documentation & evidence
Designs, commissioning records, warranties, operation manuals and handover files, checked for completeness and consistency.
- Indexed document pack review
- MCS evidence, where applicable
- DNO, G99 and G100 evidence

COMMERCIAL SOLAR PV INSPECTION & ASSURANCE
Commercial solar PV inspections, compliance evidence reviews and thermal surveys. Understand the condition of your installation, the evidence behind it and what needs attention.

For building owners, facilities teams,
installers and asset managers.
One clear view of your solar installation.
Evidence. Condition. Next steps.
01 / WHAT WE REVIEW
Start with your documentation pack. Add the on-site checks and specialist reviews that fit your project.
Designs, commissioning records, warranties, operation manuals and handover files, checked for completeness and consistency.
Compare supplied reports and your company’s requirements with the proposed or installed system.
A practical view of visible installation quality, deviations and areas requiring further investigation.
Additional perspectives on the array and accessible electrical connections, within agreed access and survey conditions.
Know what is ready, what is missing and which snags still need closing before you accept the installation.
Keep records current and technical questions moving with planned annual reviews or a remote support retainer.
A CLEAR ROUTE FORWARD
Each review ends with findings you can work with. Evidence supported within scope, identified nonconformance, not verified, or not applicable.
We agree the system boundaries, available evidence and review objectives.
Desktop review and agreed site checks bring the available evidence together.
Clear findings, priorities and next steps help your team close the gaps.
02 / CHOOSE YOUR STARTING POINT
Over 500 kWp, multi-building, HV or substantial battery storage? Individually quoted.
Starting prices per site, excluding VAT. Final scope, records, access and visits confirmed in your quotation.
P1
One indexed pack, evidence gaps and an action list. Includes one consolidated response review.
Select P1P2
P1 plus supplied company requirements, fire-strategy and structural-report interfaces. Desktop review.
Select P2P3
P1 plus one visual site visit, photographs, condition findings and actions. Surveys and testing extra.
Select P3P4
P1 plus a completion visit, commissioning evidence, snag register and one desktop close-out.
Select P4P5
One planned annual condition visit, records update and action-review meeting. Baseline extra if needed.
Select P5BETTER TOGETHER
Coordinated bundles for straightforward sites up to 50 kWp. Larger installations receive a tailored bundle quotation.
B1 / CONDITION + THERMAL
Save £250 on selected services
B2 / HANDOVER + THERMAL
Save £350 on selected services
B3 / FULL ASSURANCE REVIEW
Save £745 on selected services
Savings compare the current selected-service totals of £1,945 / £2,445 / £5,240, using entry-level same-visit add-ons and counting shared document review once. They are not previous selling prices. One coordinated site visit and one consolidated desktop close-out are included; safe access and suitable survey conditions are required. Remove and reprice modules that do not apply. Testing, repairs, specialist certification, annual care and retainers are excluded.
MORE SITES, MORE VALUE
Discounts on eligible P1–P4 package professional fees.
One client and contract entity, similar scopes, an indexed pack per site, delivery within 90 days and visits that can be grouped by location and date. Discounts exclude bundles B1–B3, P5, retainers, individual services, add-ons, extra hours, travel, accommodation, access, statutory/DNO fees and third-party specialists. Discounts do not stack. Changed site counts or programmes require a revised written quotation.
| Service | From, ex VAT |
|---|---|
| Documentation pack | £495 |
| Company / operational requirements | £350 |
| Fire-strategy interface | £550 |
| Structural-report / design comparison | £450 |
| Visual installation quality | £750 |
| Wiring Regulations evidence (no electrical testing) | £550 |
| LV infrastructure / integration | £650 |
| PV thermal screening | £650 |
| Electrical connection thermal screening | £495 |
| Drone visual survey | £450 |
| MCS evidence, where applicable | £250 |
| DNO / G99 / G100 evidence | £350 |
| Commissioning evidence | £350 |
| Focused completion / handover (full P1 extra) | £1,250 |
| Ongoing assurance, per year | £995 |
Entry prices are for a straightforward approximately 30–50 kWp site. Same-visit add-ons: drone £250–£400; PV thermal £450–£800; limited electrical thermal £250–£450. Extra desktop close-out up to two hours £190; local half-day remedial revisit with short report from £450. Additional approved technical work £95/hour.
03 / KEEP THE SUPPORT CLOSE
Remote technical support for document reviews, questions and follow-up. Choose the level that fits your workload.
3 hours of remote support
Initial 3-month minimum: £855Select Essential6 hours of remote support
Initial 3-month minimum: £1,620Select Professional12 hours of remote support
Initial 3-month minimum: £3,060Select PortfolioMonthly payment upfront. Calendar-month allowances from the 1st; partial months expressly agreed. Work is recorded in 15-minute units including calls, preparation and reporting. Unused hours expire with no rollover. Additional work requires approval at £95/hour. Site visits, drone surveys, thermal surveys, testing and specialists are separately quoted. The same work is not billed under both a fixed package and a retainer. After the initial three months, the retainer continues monthly with 30 days’ written notice effective at month-end, no earlier than the initial term. Normal business hours; task delivery is agreed. No emergency or guaranteed-response service.
04 / TAKE A CLOSER LOOK
BEFORE YOU START
A review reports what the available evidence and agreed inspections support. It does not itself issue an EIC, EICR, MCS certificate, DNO approval, fire strategy or structural certification. Any specialist certification or testing must be separately commissioned with the appropriate competent signatory.
Missing evidence is recorded as a gap or as not verified; it does not automatically mean the installation is noncompliant. Your report identifies what is needed to reach a clearer conclusion.
Thermal screening can highlight surface temperature anomalies under suitable operating and environmental conditions. It does not on its own establish the full cause of a fault or prove compliance. Weather or access constraints may require a separately agreed return visit.
The review compares supplied reports and requirements with the installation or design. New fire strategies, structural calculations, electrical testing and specialist sign-off are outside the standard review packages.
START WITH YOUR SITE
Prepare a short project brief or use the fillable enquiry form. Include the site size, review stage and the records you already have.
Choose “Open email draft” to prepare your enquiry in your email app, then review and send it. You can also download the brief. This website does not store your details.
Prefer the PDF? Complete the enquiry form and email it to us with your available project records.
Download the fillable PDF